Lean and Green Supplier Selection Problem: A Novel Multi Objective Linear Programming Model for an Electronics Board Manufacturing Company in Turkey

  • Yazar/lar ÇALIK, Ahmet
    PAKSOY, Turan
    HUBER, Sandra
  • Yayın Türü Kitap Bölümü
  • Yayın Tarihi 2019
  • DOI Numarası 10.1007/978-3-319-99304-1_10
  • Yayıncı Springer New York LLC
  • Tek Biçim Adres http://hdl.handle.net/20.500.12498/2825

Even though various studies are proposed to evaluate and determine the best suppliers, studies generally consider similar factors such as cost, quality, delivery time etc. in the supplier selection problem. Nowadays, some lean and green issues such as on time (JIT) delivery, waste reduction, avoidance and treatment of hazardous materials, energy efficiency, occupational health and safety, corporate social responsibility, etc. started to be addressed together with the supplier selection process. Lean and Green Supply Chain Management (L-GSCM) is a dynamic field for companies to gain advantages in the competitive business market place. In the light of these concepts a new supplier selection process is developed for an electronics board manufacturing company in Turkey. We present an integrated approach which consists of three stages. In the first stage, the Fuzzy Analytic Hierarchy Process (FAHP) method is applied in order to determine the weights of the lean and green criteria with respect to different experts’ judgments using linguistic terms. At the second stage, linguistic judgments related to qualitative drivers are provided from decision makers. Then these fuzzy, judgements are aggregated by means of fuzzy group decision making and deffuzzified to crisp scores. The outputs of this stage are the quantitative data of a Multi-Objective Linear Programming (MOLP) model. In the third stage, a novel Fuzzy Weighted Additive Max-Min approach with Group Decision-Making (F-WAMG) is proposed and applied to guarantee that satisfaction degrees of each objective functions in the MOLP model are greater than or equal to their own weights. The proposed model and solution approach is applied to an electronics board manufacturing company in Turkey. The results point out that the proposed F-WAMG approach yields consistent satisfaction degrees with respect to weights of objectives that represent decision makers’ preferences and judgements. © 2019, Springer Nature Switzerland AG.

  • Koleksiyonlar
Erişime Açık
Görüntülenme
3
22.03.2024 tarihinden bu yana
İndirme
1
22.03.2024 tarihinden bu yana
Son Erişim Tarihi
17 Nisan 2024 13:58
Google Kontrol
Tıklayınız
Tam Metin
Detaylı Görünüm
Eser Adı
(dc.title)
Lean and Green Supplier Selection Problem: A Novel Multi Objective Linear Programming Model for an Electronics Board Manufacturing Company in Turkey
Yayın Türü
(dc.type)
Kitap Bölümü
Yazar/lar
(dc.contributor.author)
ÇALIK, Ahmet
Yazar/lar
(dc.contributor.author)
PAKSOY, Turan
Yazar/lar
(dc.contributor.author)
HUBER, Sandra
DOI Numarası
(dc.identifier.doi)
10.1007/978-3-319-99304-1_10
Atıf Dizini
(dc.source.database)
Scopus
Yayıncı
(dc.publisher)
Springer New York LLC
Yayın Tarihi
(dc.date.issued)
2019
Kayıt Giriş Tarihi
(dc.date.accessioned)
2020-08-07T12:51:47Z
Açık Erişim tarihi
(dc.date.available)
2020-08-07T12:51:47Z
Kaynak
(dc.source)
International Series in Operations Research and Management Science
ISSN
(dc.identifier.issn)
08848289 (ISSN)
Özet
(dc.description.abstract)
Even though various studies are proposed to evaluate and determine the best suppliers, studies generally consider similar factors such as cost, quality, delivery time etc. in the supplier selection problem. Nowadays, some lean and green issues such as on time (JIT) delivery, waste reduction, avoidance and treatment of hazardous materials, energy efficiency, occupational health and safety, corporate social responsibility, etc. started to be addressed together with the supplier selection process. Lean and Green Supply Chain Management (L-GSCM) is a dynamic field for companies to gain advantages in the competitive business market place. In the light of these concepts a new supplier selection process is developed for an electronics board manufacturing company in Turkey. We present an integrated approach which consists of three stages. In the first stage, the Fuzzy Analytic Hierarchy Process (FAHP) method is applied in order to determine the weights of the lean and green criteria with respect to different experts’ judgments using linguistic terms. At the second stage, linguistic judgments related to qualitative drivers are provided from decision makers. Then these fuzzy, judgements are aggregated by means of fuzzy group decision making and deffuzzified to crisp scores. The outputs of this stage are the quantitative data of a Multi-Objective Linear Programming (MOLP) model. In the third stage, a novel Fuzzy Weighted Additive Max-Min approach with Group Decision-Making (F-WAMG) is proposed and applied to guarantee that satisfaction degrees of each objective functions in the MOLP model are greater than or equal to their own weights. The proposed model and solution approach is applied to an electronics board manufacturing company in Turkey. The results point out that the proposed F-WAMG approach yields consistent satisfaction degrees with respect to weights of objectives that represent decision makers’ preferences and judgements. © 2019, Springer Nature Switzerland AG.
Yayın Dili
(dc.language.iso)
en
Tek Biçim Adres
(dc.identifier.uri)
http://hdl.handle.net/20.500.12498/2825
Analizler
Yayın Görüntülenme
Yayın Görüntülenme
Erişilen ülkeler
Erişilen şehirler
6698 sayılı Kişisel Verilerin Korunması Kanunu kapsamında yükümlülüklerimiz ve cerez politikamız hakkında bilgi sahibi olmak için alttaki bağlantıyı kullanabilirsiniz.
Tamam

creativecommons
Bu site altında yer alan tüm kaynaklar Creative Commons Alıntı-GayriTicari-Türetilemez 4.0 Uluslararası Lisansı ile lisanslanmıştır.
Platforms